250 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...


Establishment of Permanent Monitoring Plots in the NWT
Principal Investigator: Smith, Lisa
Licensed Year(s): 2005
Summary: The Permanent Monitoring Plots will provide experimental data on forest growth and progression, cumulative impact monitoring, and will provide data for territorial and national reporting requirements. Most plots will be accessed only by helicopter. At each site, a 400 square metre plot (11.28 m radius) will be established with rebar as a centre post. All trees, shrubs and other vegetation will...


The Transition into Nursing for New Graduate Nurses in the Northwest Territories: a Grounded Theory Study
Principal Investigator: Stockton, Pam
Licensed Year(s): 2005 2004
Summary: This is the second year of a study that the researcher expects will help to explain how new graduate nurses begin to practice in the NWT. The researcher is about halfway through interviewing a total of 10 to 15 currently-practicing graduates of the Nor...


Sahtu Settlement Harvest Study
Principal Investigator: Bayha, Janet
Licensed Year(s): 2004 2003 2002 2001 2000 1998
Summary: The Sahtu Settlement Harvest Study began as a 5-year project (1998-2003) in the five Sahtu Settlement communities. This Study is being continued in 2004 and 2005. Each month, in each community, a local interviewer recommended by the local Renewable Reso...


Aboriginal Participation in the Voluntary Sector in the Northwest Territories
Principal Investigator: Little, Lois M.
Licensed Year(s): 2004
Summary: Aboriginal people make up half of the total NWT population but are underrepresented in segments of the voluntary sector. The NWT Literacy Council, the YWCA of Yellowknife, and the Native Women's Association of the NWT want to gain an understanding of Abo...


2003 Traditional Knowledge and Socio-Economic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge studies in the Sahtu Settlement Area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


Collaborative Approaches to Ecosystem Management in Indonesia: Learning from Experience in Canada's North
Principal Investigator: Armitage, Derek
Licensed Year(s): 2003
Summary: In Indonesia, indigenous groups are articulating a demand for rights to lands and resources and a greater role in processes of development and change. There is also an increasing emphasis on negotiating partnerships and collaborative management arrangeme...


Foster Parent Training Needs Assessment in the Northwest Territories
Principal Investigator: Tynes, Deborah
Licensed Year(s): 2002
Summary: The researchers method of data collection is to interview foster parents, social workers, supervisors, management, the Yellowknife Foster Famiily Association, and the Department of Health & Social Services. The sampling size will be approximately 20 part...


Evaluating Co-management: A Framework for Analysis
Principal Investigator: Bateyko, Darwin
Licensed Year(s): 2002
Summary: The purpose of the research is to develop a set of recommendations for management practitioners, which will improve resource management decisions within co-management regimes. These recommendations will be based on the field-testing of a methodology desi...


TOTAL PAGES: 25