Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Millman, Peter M Licensed Year(s):2007
2006
Summary:
The objective of the project is to observe and document geological features in completing a reconnaissance of the surface geology of the Cambrian and Proteozoic sections in four areas the Central Mackenzie region: Mackenzie Mountains, Mount Clark, Black Water Lake and Cap Mountain. Geological information obtained from this field program will be used to refine Devon Canada's exploration model in th...
Principal Investigator:Duk-Rodkin, Alejandra ADR Licensed Year(s):20072006
2005
2004 Summary:
It is important for researchers to improve their understanding of the sensitivity of slopes to disturbance from development, especially in the context of progressive climate warming. Additionally, predictions of the impacts of climate change on the terra...
Principal Investigator:Smith, Rod Licensed Year(s):
1999
Summary:
The purpose of the study is to continue the standard 1:50 000 geological mapping that was started in the summer of 1997 as per mandate of the Geological Survey of Canada. Parties will be sent out by helicopter from Fort Liard and most of the area will be visited only once. The primary method of fieldwork is by foot traverse. Observations will be recorded and small samples of rocks and sediments...
Principal Investigator:Katopodis, C. Licensed Year(s):
1977
Summary:
Topographic and hydrometric survey for the design of weirs to assit fish in entering culverts....