Principal Investigator:Nearing, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5047.
The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...
Principal Investigator:Schulz, Eva Licensed Year(s):
2013
Summary:
The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank.
Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...
Principal Investigator:Kustan, Ed Licensed Year(s):
2005
Summary:
The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...
Principal Investigator:Kustan, Ed Licensed Year(s):
2005
2004 Summary:
The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...