Principal Investigator:Duk-Rodkin, Alejandra ADR Licensed Year(s):
2007
200620052004 Summary:
Project objectives are to map, identify, describe characteristics (geotechnical aspects) and date surficial deposits in the vicinity of the proposed pipeline corridor. This knowledge will assess: 1. granular resources. 2. slope instability, landslide occurrence and potential due mainly to instability of the active layer, forest fires and erosion. 3. geochemical analysis on a regional basis of till...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Van Stempvoort, Dale R. Licensed Year(s):
2005
Summary:
The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Ferguson, Gordon Licensed Year(s):2003
2002
Summary:
A total of eight permanent sampling transects will be established along the pipeline right-of-way; two in each of the four dominant representative vegetation habitats. Site-specific evaluations at each transect will measure re-vegetative success using ve...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...
Principal Investigator:Harry, David Licensed Year(s):
1985
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zana pipeline. Fieldwork will focus on investigation of terrain conditions during and subsequent to the 1984-85 winter construction season....
Principal Investigator:Sherstone, David A. Licensed Year(s):
1979
Summary:
To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....