Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Van Stempvoort, Dale R. Licensed Year(s):
2005
Summary:
The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Nahendeh, with assistance from Alpine Environmental Consulting Ltd. and Golder Associates Ltd. was contracted on behalf of ChevronTexaco Corporation to conduct vegetation monitoring studies for the pipeline right-of-way from Chevron K-29 wellsite to the...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...
Principal Investigator:Squires Taylor, Cindy Licensed Year(s):1992
1991
Summary:
The Researcher will conduct a survey, approximately 30 km on either side of the Mackenzie River using satellite imagery. A classification will be undertaken of the area from the Mackenzie Delta to the Fort Simpson area, with wider zones along the east side to include proposed pipeline routes. The information can be plotted as colour maps to show the location of trap lines, forest fires or wildlife...
Principal Investigator:Sherstone, D.A. Licensed Year(s):
1980
Summary:
To conduct aerial photography surveys to identify ice jams with resultant flooding. To conduct aerial photography to identify potential non-Mackenzie Valley pipeline routes. To obtain water samples to determine sediment loads carried by the river at various times and locations....