3 Dossier(s) trouvé(s) pour le chercheur principal "MacNeill, Scott" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Environmental Surveys of Fortune Minerals NICO Project
chercheur principal: MacNeill, Scott W
Année(s) de permis: 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Résumé: The objective of this study is to supplement the existing environmental baseline data for the Fortune Minerals NICO Property to support the environmental assessment process for future mine development. Environmental surveys will be conducted in the area surrounding the project base camp and along the proposed routes of an all-weather access road to Behchoko and a transmission line to Snare hyd...


Matthews Lake and Area Fish Habitat Restoration Project (MLAFHRP)
chercheur principal: MacNeill, Scott W
Année(s) de permis: 2004 2003
Résumé: Approximately 200 m of contiguous degraded shoreline habitat at Matthews Lake will be identified during initial field investigations and will be further subdivided into two 100m 'control' and 'treatment' sites. Prior to the rehabilitation of the 'treatme...


2003 Port Radium: Phase 2 Environmental Studies
chercheur principal: MacNeill, Scott W
Année(s) de permis: 2003
Résumé: This 5-day sampling program will involve fisheries, aquatic, and vegetation studies at/in the vicinity of the abandoned Port Radium Mine site. Concentrations of five biologically significant metals (antimony, arsenic, lead, nickel and zinc) will be dete...


TOTAL PAGES: 1