3 Dossier(s) trouvé(s) pour le chercheur principal "Good, Ron" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Good, Ron Année(s) de permis:
2002
Résumé:
This research is part of an ongoing program to develop geophysical standards for pipeline route surveying. This line has been chosen because past shallow drilling programs on this line have provided us with a great deal of ground truth, geology, temperat...
chercheur principal:Good, Ron Année(s) de permis:
1999
Résumé:
The survey will be carried out along two lines near the Mallik L-38 drill site, with phones at 3 m spacings. A number of energy sources will be tried. These will include an 8 gauge "Buffalo" gun, an elastic accelerated weight drop, a mini-vib system, and a hammer and plate. The Buffalo gun will require holes drilled every 3 m, its 500 grain 8 gauge shells are fired at 1 metre depth and have no im...
chercheur principal:Good, Ron Année(s) de permis:
1994
19931993199219921991 Résumé:
The researcher will conduct a geotechnical survey of the area. Components of this survey will include shallow geological drilling, geophysical downholde logging, geophysical electrical sounding and a snow depth transect. A crew will transverse the area by foot and skidoo....