13 record(s) found for principal investigator "Graburn, Larry" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Spring Break-up Watercourse Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...


2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2005 Winter Geotechnical Field Program: Taglu Field
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: The general objective of the program is to obtain information with respect to subsurface conditions at the site by drilling up to fifty boreholes to depths ranging from sixteen to twenty metres. The specific objectives of the program are to characterize...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


2004 Spring Break-up Watercourse Investigation Program - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


2004 Spring Break-up Watercourse Investigation Program - Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


2004 Spring Break-up Watercourse Investigation Program - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


2003 Fort Simpson Summer Field Geotechnical Investigation Program - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...


2003 Field Reconnaissance - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Field Reconnaissance - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


TOTAL PAGES: 2