Principal Investigator:Thomas, Craig J Licensed Year(s):
2009
Summary:
The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation.
The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2008
2005 Summary:
Objectives of this research will be to confirm the presence or absence of fish habitat at stream crossings associated with the Prairie Creek Winter Access Road alignment and if present document fish habitat characteristics (physical). The information will support documentation requirements for the Department of Fisheries and Oceans relating to the Fisheries Act and the potential need for a Fisheri...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2000
Summary:
This is a preliminary fisheries study to confirm 1989 baseline studies and to assist in impact assessment for Abandonment and Restoration (A & R) Plan for site closure. The researchers will conduct habitat assessments along drainages of Steeves Lake and Indin River (i.e. fish habitat mapping, assessment of habitat potential, 'spot check' confirmation of fish communities, the collection of instant...
Principal Investigator:Thomas, Craig J Licensed Year(s):2003200220012000
1999
1998 Summary:
The project will look at the effectiveness of created fish habitat within the on-site Panda Diversion Channel. Assessments will include fish use, invertebrate use, stability and function on a seasonal and yearly basis. Assessments will include the collection of fish (all to be released live), macroinvertebrates, the identification of habitat features, substrate assessments, and hydrology and hydra...
Principal Investigator:Thomas, Craig J Licensed Year(s):
1998
Summary:
This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...
Principal Investigator:Thomas, Craig J Licensed Year(s):
1998
Summary:
This study serves to identify existing habitat characteristics of the identified portion of Baker Creek, identify resident fish communities at the time of sampling, and to identify potential rehabilitation and restoration concepts to assist in the re-establishment of historic fish habitat conditions. Field studies will involve the identification of fish habitat characteristics, the identification ...