8 record(s) found with the tag "water level" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Improving Habitat Connectivity to Enhance Productive Capacity of Arctic Freshwater Ecosystems
Principal Investigator: Tonn, William
Licensed Year(s): 2014 2013 2012 2011 2010 2009
Summary: The objectives of this research project are: to study the freshwater ecology, hydrology, and hydraulics of small lakes and streams in the Lac de Gras basin before habitat modification; to monitor the changes in ecosystem productive capacity resulting from habitat modifications designed to increase habitat connectivity and fish passage; and to assess the effectiveness of such habitat modifications ...


2002 Aquatic Studies in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


Environmental Assessment for Proposed Oil and Gas Development Activities in the Gwich'in Region, NWT.
Principal Investigator: Melton, Derek
Licensed Year(s): 2002 2000
Summary: Researchers will assess fish habitat (by documenting the potential of waterbodies) and to determine the presence or absense of wildlife in the vicinity of the proposed project. A search for registered archaelogical sites within the proposed area will also be undertaken. Information from these studies will form part of an environmental assessment for the proposed project. Researchers will access...


Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


TOTAL PAGES: 1