Principal Investigator:Henderson, Bob C. Licensed Year(s):
2007
Summary:
The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...
Principal Investigator:Robertson, Scott Licensed Year(s):
2007
Summary:
The overall objective of this project is to collect additional Soil and Terrain information for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project.
De Beers Canada Inc. has been conducting Soils and Terrain baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to the Terrain and Soils ba...
Principal Investigator:Hoos, Rick Licensed Year(s):
2007
Summary:
A new 156 km winter road is proposed, extending from the end of the Ingraham Trail to Lockhart Lake, following a route similar to that of the existing winter road. The objective is to acquire airborne digital imagery (including LiDAR and digital video) data to produce maps; to determine fish presence/absence in streams around the route and fish utilization of habitat, to determine potential fish h...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be performed by...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be by helicopte...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Kim, Jae Licensed Year(s):
2007
2006 Summary:
The objective of this program is to ground-truth (survey) routes and collect topographical and meteorological information relating to proposed access roads. Winter access roads will go to the Parsons Lake North pad from Tuktoyaktuk and from the mouth of Pete's Creek. The all season roads will go from the north pad to the gravel resource and to the airstrip, as well as the airstrip itself.
Snow ...
Principal Investigator:Smith, Sharon S Licensed Year(s):20182017201620152014201320122011201020092008
2007
2006 Summary:
Forty-four sites will be monitored during the course of the project: four sites in Gwich'in Settlement Area, twenty-two sites in the Sahtu Settlement Area and eighteen sites in the Deh Cho Region. Preferred locations will be chosen near existing highway/winter roads or the existing pipeline, trail and cutlines, for continuous site accessibility and to minimize disturbance to the environment. One o...
Principal Investigator:Swisher, Sara S Licensed Year(s):2010
2006
Summary:
The purpose of this study is to obtain traditional knowledge from Fort Resolution aboriginal residents, focussing on individuals aged 45 years or older. The information will be used for planning, and incorporated into the Developer’s Assessment Report (DAR) as required by the Mackenzie Valley Environmental Impact Review Board's (MVEIRB) Environmental Assessment Process.
Interviews will be ut...