Principal Investigator:Swisher, Sara S Licensed Year(s):
2006
Summary:
The purpose of this study is to obtain traditional knowledge from Hay River Metis aboriginal residents focussing on individuals aged 45 years or older. The information will be used for planning, and incorporated into the Developer’s assessment Report (DAR) as required by the Mackenzie Valley Environmental Impact Review Board’s (MVEIRB) Environmental Assessment Process.
Interviews will be utiliz...
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2006
Summary:
Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik.
The field assessment will involve four s...
Principal Investigator:Couture, Réjean Licensed Year(s):
2006
2005 Summary:
The goal of this project is to compile updated baseline information/knowledge on the types, regional distribution, and controls (e.g. forests fires, climate change) of landslides. The main objectives of the field reconnaissance at landslide sites are six-fold: 1) to validate previous data collected through air photo interpretation and remote sensing techniques; 2) to carry out detailed mapping at ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The objective of the proposed summer geotechnical investigations is to gather information on soil and ground conditions adjacent to a proposed pipeline right-of-way in the Mackenzie Valley. The gathered information will be used in preparing subsequent regulatory applications. The proposed investigations will focus on four potential borrow sources, which will yield information for use in determinin...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Kokelj, Steven V Licensed Year(s):201220112010200920082007
2006
2005 Summary:
The Mackenzie Delta region is characterized by diverse terrain and ecological conditions. Responsible and effective management of oil and gas exploration and potential production and pipeline construction in this region necessitates a broad but detailed understanding of environmental conditions in this region and the potential response of this environment to climate change or anthropogenic disturb...
Principal Investigator:De Pascale, Greg P Licensed Year(s):
2005
Summary:
Sand, gravel and crushed stone are valuable geological resources, collectively known as aggregates. They are essential bed, foundation and building materials. The presence of massive ice in aggregate deposits results in a series of resource management problems, particularly for the oil industry and its contractors who rely on local granular deposits as building material. From an environmental pers...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
During this study, activities conducted will include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations.
Vegetation mapping surveys will consist of visual observations from a helicopter to confirm vegetation types for mapping. These surveys will be conducted in conjuction with rare plant surveys. Sampling equi...