Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licensed Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


Biocomplexity of Frostboil Ecosystems
Principal Investigator: Walker, Donald A
Licensed Year(s): 2006 2005 2004 2003
Summary: The focus of this study is on the interactions between soils, climate and vegetation, and the way that these interactions control the patterns of bare soil and vegetation that are found in the Arctic. Often these patterns form circular features known as...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


Vegetation, Forestry and Soils Surveys: Sahtu Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...


Vegetation, Forestry and Soils Surveys: Gwich'in Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sites will be contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, vehicle and/or on foot. To avoid c...


Assessment of Stream Crossings for Planned Improvements to the Mackenzie Valley Winter Road.
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...


Chevron Ft. Liard Potential Routing Selection Program
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...


MAGS Ground-Based Measurement Studies
Principal Investigator: Kochtubajda, Bob
Licensed Year(s): 1998
Summary: We propose to transport ad install new automatic weather stations by truck, fixed wing and helicopter to three sites in the Fort Simpson area between mid-June through mid July 1998. The automatic weather stations are both solar-powered and battery-powered, and collect and transmit meteorological data for use in weather forecasts and warnings. The weather stations will be used to support the scien...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...