Principal Investigator:Biggar, Kevin Licensed Year(s):
2006
2005 Summary:
Since the 1970s, the oil and gas industry has drilled at least nineteen exploratory wells in the Kendall Island Bird Sanctuary. Observations at associated drilling mud-sumps have been made; however, there remains a paucity of field data describing site conditions. It is also appreciated that construction of the proposed Mackenzie Valley pipeline will stimulate the development of Niglintgak and Tag...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):20182017201620152014201220102009200820072006
2005
20042003 Summary:
This study is to monitor the environmental impacts of disturbances caused by the Canol Project and to measure the effects on permafrost of climate change. The Canol disturbance studies have been underway since the late 1970's and the permafrost studies since 1990. This is year 15 of a 20-year study.
Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond...
Principal Investigator:Nichol, Susan L. Licensed Year(s):
2005
Summary:
The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....
Principal Investigator:Turchenek, Larry Licensed Year(s):
2004
Summary:
The overall project objective is to collect information on the Gahcho KuÚ and 'control lake' areas for use in impact assessment and environmental protection planning for a proposed mine development. AMEC Earth and Environmental (AMEC) has been retained t...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities in the pro...