53 record(s) found with the tag "pipeline corridor" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2002 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...


2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


Summer 2001 Hydrology Surveys Within the Sahtu Settlement Region: Biophysical Baseline Studies in Support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Sawetsky, Les
Licensed Year(s): 2001
Summary: A detailed data collection program will be undertaken on all major streams in the proposed pipeline corridor. The proposed survey will begin in mid-September and continue until late December, 2001 and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on describing h...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Located Within the Sahtu Settlement Area.
Principal Investigator: Collard, Tod
Licensed Year(s): 2001
Summary: The proposed field research program on lands located within the Sahtu Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as ap...


Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Within the Gwich'in Settlement Area.
Principal Investigator: Collard, Tod
Licensed Year(s): 2001
Summary: The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...


Reconnaissance of the East Channel of the Mackenzie Delta
Principal Investigator: Brooks, Greg
Licensed Year(s): 1993
Summary: If an oil and gas pipeline is constructed that extends from the Mackenzie Delta to the south, the pipeline will likely cross the East Channel at either Lousy or Swimming Points. Both of these sites have been studied in the past, but little detailed information has been collected on the physical features of these sites. Data will be collected on the features of these sites, including a survey of ...


Licence #5015
Principal Investigator: Harry, David
Licensed Year(s): 1985
Summary: A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zana pipeline. Fieldwork will focus on investigation of terrain conditions during and subsequent to the 1984-85 winter construction season....


TOTAL PAGES: 6