53 record(s) found with the tag "pipeline corridor" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2004 Winter and Spring Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...


Traditional Knowledge Studies for the Mackenzie Gas Project within Liidlii Kue First Nation Traditional Territory
Principal Investigator: Gill, Lyall
Licensed Year(s): 2003
Summary: This study involves collecting existing Traditional Knowledge information, gathering new information, and producing a Traditional Knowledge report. A cooperative approach has been developed involving Mackenzie Gas Project (MGP), Mackenzie Project Environment Group (MPEG), Liidlii Ku'e First Nation and Metis Nation of Fort Simpson. Project management is being provided by Nogha Geomatics Ltd. whic...


Surficial Geology Mapping Fort Norman (96C), Blackwater Lake (96B), Mahoney Lake (96F)
Principal Investigator: Duk-Rodkin, Alejandra ADR
Licensed Year(s): 2003
Summary: This project aims to obtain a better understanding of the sensitivity of slopes to disturbance from development, especially in the context of progressive climate warming. It will also identify baseline levels for natural and anthropogenic contaminants,...


2003 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


Modified Phase II Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The environmental assessment of the wellsite and the associated facilities may include 1) a walk around of the lease area to identify additional environmental issues if any; 2) a modified Phase II Assessment (including assessing the areas of the glycol,...


Post Construction Water Quality Monitoring and Pipeline Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: A total of eight permanent sampling transects will be established along the pipeline right-of-way; two in each of the four dominant representative vegetation habitats. Site-specific evaluations at each transect will measure re-vegetative success using ve...


2002 Aquatic Studies in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...


2002 Route and Site Selection in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...