23 record(s) found with the tag "pipeline corridor" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


2006 - 2007 Biophysical and Reconnaissance Studies in the Gwich’in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be by helicopte...


2006 – 2007 Biophysical and Reconnaissance Studies in the Deh Cho Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be carried out ...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006 2006
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existi...


2005 Terrestrial Studies in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations. All of the studies will be conducted by three- or four-person crews supported by helicopter. A local assistant will be included as part of each terrestrial survey team to assist in observing and recording data taken at surve...


2005 Winter and Spring Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


Snow accumulation/runoff in high latitude permafrost basins
Principal Investigator: Marsh, Philip
Licensed Year(s): 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: The primary objective of this project is to improve understanding of the changes in water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek, Hans Creek, and Zed Creek sites will be accessed...


Sustainable Development in the Mackenzie Gas Project; Views of Young Inuvialuit Adults in the Inuvialuit Settlement Region
Principal Investigator: Salokangas, Raila M
Licensed Year(s): 2004
Summary: This study will examine how sustainable development is taken into account in the Mackenzie Gas Project (MGP), with a specific focus on Inuvialuit opinions concerning the Project's environmental and socio-economic impacts. The research will evaluate the p...


2003 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


TOTAL PAGES: 3