18 record(s) found with the tag "land reclamation" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Aurora Research Institute Mallik 2L-38 and 3L/4L/5L-38 Sump Monitoring and Retrofit Program
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2008
Summary: The objectives of the sump monitoring activities are to gain further knowledge of long-term sump integrity and sump monitoring techniques while addressing both the commitments of the Mallik Gas Hydrate Project and the recommendations from site surveys. Active layer depth will be measured to determine differences between sumps and undisturbed areas. Ground temperature will be recorded. Ground co...


Environmental Investigations for Reclamation Planning at the Tundra Mine
Principal Investigator: Robinson, Cindy
Licensed Year(s): 2004
Summary: This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...


2004 Winter and Spring Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...


2004 Winter and Spring Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties conducted a number of baseline studies during 2001, 2002, and 2003 as part of the Mackenzie Gas Project. These...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Phase 3 Environmental Baseline Program, Diavik Diamond Project, Lac de Gras, NWT
Principal Investigator: Digel, Mark
Licensed Year(s): 1996 1995
Summary: Methods of data collection will include water quality and bottom sampling in Lac de Gras and Lac du Sauvage; automatic and manual water level recordings; bathometric work; automatic weather stations and the monitoring of air-borne particles and visibility; continuation of baseline studies of soils and terrain, and vegetation; fish population, habitat, health, and spawning habits studies; baseline ...


NWT Diamonds Project - Revegetation Research
Principal Investigator: Witteman, John
Licensed Year(s): 1996 1995
Summary: As part of overall reclamation goals of BHP, the 1996 season will focus on three components. Vegetation response will be assessed in August using the point-frame method. Within the legume, indigenous seed and shrub cutting plots, plant density will be recorded. Soil samples in replicates of three will be collected from each treatment to analyze physical and chemical characteristics. Secondly, ...


Reclamation of Simulated Transport Corridors in Subarctic Forests
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 1989 1988 1987
Summary: Dr. Peter Kershaw and his team will continue his work, begun in 1985, to assess and monitor the environmental characteristics of disburbed and undisturbed forest areas, in relation to revegetation and rehabilitation of pipeline corridors. His work will test impacts from northern crude oil spills....


TOTAL PAGES: 2