9 record(s) found with the tag "infrastructure planning" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

HT Hydro Hydrology Monitoring Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: NT Hydro is in the process of characterizing the hydro potential of the NWT, and the hydrological information collected from the four gauging sites will be used to determine if any hydro potential exists on these four rivers. These gauges are not being installed in relation to development of a specific hydro project on these water bodies. Installation of the gauging stations: Hydrometric g...


2004 Summer and Fall Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...


2004 Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...


2004 Summer and Fall Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...


2004 Vertical Control Survey in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Alternate Forest Products: A Dynamic Time and Space Model of Driftwood Along the Lower Mackenzie River
Principal Investigator: Wein, Ross
Licensed Year(s): 2003 2002 2001
Summary: In June driftwood quantity will be measured using river hydrology and visual sitings by researchers and ferry operators in Tsiigehchic, and Fort McPherson. From June to August, log sinkage data will be collected from sites near Inuvik. Driftwood piles id...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


Licence #2134
Principal Investigator: Katopodis, C.
Licensed Year(s): 1977
Summary: Topographic and hydrometric survey for the design of weirs to assit fish in entering culverts....


TOTAL PAGES: 1