Principal Investigator:d'Entremont, Marc Licensed Year(s):
2004
Summary:
The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...
Principal Investigator:Butler, Helen Licensed Year(s):
2003
Summary:
The objective of this project is to determine if Pelzer Pond, at the Ekati Diamond Mine site, is a fish bearing water body. Previous fishing efforts conducted as part of a baseline study in 1999 indicated that there were no fish in the pond. The resear...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
Principal Investigator:Ash, Gary R. Licensed Year(s):
1981
Summary:
To identify major environmental concerns of the proposed Hydroelectric development as related to fish....
Principal Investigator:Nieminen, G.A. Licensed Year(s):
1980
Summary:
To undertake environmental field studies relating tothe environmental assessment of a mine/mill development and a winterd access road. The studies will include fisheries studies, vegetation identification, soil sampling, and wildlife habitat assessment....
Principal Investigator:McGregor, C.A. Licensed Year(s):
1976
Summary:
Parsons Lake - a quantitive description of vegetation with organic content, ice content and moisture content. Sabine Peninsula - preliminary terrain sensitivity classification for use in planning transporation facilities....