Principal Investigator:Melton, Derek Licensed Year(s):
1999
Summary:
The overall goal of this project is to conduct preliminary baseline studies at Paramount Resources proposed gas well sites in the Fort Liard area. The wildlife program will begin with of a literature review to identify previously identified wildlife populations in the area. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in th...
Principal Investigator:Kruse, Jack Licensed Year(s):
1999
Summary:
Part A: "Possible Futures Model". Researchers have constructed models which project how force of change will affect communities in the future, based on local knowledge and research findings of previous studies. In 1998-99, the "Possible Futures Model" will be presented to people of Fort McPherson and Aklavik. The model allows users to consider the effects of changes that may occur in the next 40 ...
Principal Investigator:Nevitt, Zabey Licensed Year(s):1999
1998
Summary:
For many years the Dogrib have trapped and fished in and around the Marian River. There are concerns that contaminants are entering the river system. Some of the concerns include: effects on health from eating fish and effects on heath from drinking water. Field collection will take place over two days. The team will travel by canoe from Rae. Seven fish will be caught by members of the community f...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
Golder Associates was contracted on behalf of Grey Wolf Exploration to conduct preliminary baseline studies at Grey Wolf's proposed well sites. The objective of this study is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project site. A literature search for registered archaeological sites within the proposed site is also planned. Golder Associates was c...
Principal Investigator:Steinecke, Karin Licensed Year(s):
1998
1997 Summary:
The project will focus on understanding, analyzing and evaluating the reactions of the northern boreal forest ecosystems in the Great Slave Lake region due to man made stress of mining, settlement and connecting activities. The project will try to develop some general conclusions, statements and model systems. The research team (2 persons) will come from Europe to Yellowknife by plane. The base wi...
Principal Investigator:Poniatowski, Brian Licensed Year(s):
1998
Summary:
The community monitor will carry out monitoring of wildlife, principally caribou, which are of great importance to the Lutselk'e First Nation. This will be done by directly observing their numbers, sex of animals (if this can be determined), age, condition, movements and behaviour in relation to Kennedy Lake camp and to specific worksites, such as sites where drilling or till sampling are being ca...
Principal Investigator:Sutor, Greg Licensed Year(s):
1997
Summary:
Vegetation communities along the pipeline route and over other parts of the Project area would be provisionally mapped from aerial photographs. A field survey would be undertaken with an emphasis on identifying rare plants. The study area is in the Caribou Hills IBP site 4-9, which was in part proposed because of its rare flora. July is an optimum time for a single survey. Also transect sampling ...
Principal Investigator:MacDonald, Gord Licensed Year(s):
1997
Summary:
Activities at the Damoti Lake Project Site will be as follows; 1) Archaeology - short site visit with field survey, 2) Terrestrial work will emphasize vegetation types and their value as wildlife habitat. Specific surveys for signs of moose, furbearers, raptors and other species, 3) Aquatic studies will emphasize habitat values in both lake and stream locations. Water quality work, 4) Hydrology w...