Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...
Principal Investigator:Chubb, Derek Licensed Year(s):
2002
2001 Summary:
This project is to meet the requirements of the Department of Fisheries and Oceans. Sable and Two Rock Lakes will be lost through the course of mining activities and the scientific collection of data related to the fish population prior to their removal...
Principal Investigator:Chubb, Derek Licensed Year(s):
2002
Summary:
The objective of the study is to remove all fish from Beartooth Lake prior to dewatering and in a manner which respects community concerns raised in previous public stakeholders meetings. The study will 1) quantify fish production, fish habitat, and prod...
Principal Investigator:Martel, Edith Licensed Year(s):
2001
Summary:
The research team will be transported from Yellowknife by aircraft, and will travel by small boat in the field. Samples (fist-sized chunks of rock) will be collected with a hammer, and returned to the laboratory for detailed physical and chemical analysis. Field camps will be low impact, and will be occupied by only 2 persons at a time. All human waste will be buried, all non-burnable garbage w...
Principal Investigator:Moore, Peter Licensed Year(s):
2001
Summary:
Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....
Principal Investigator:Hoyt, Andrea J. Licensed Year(s):
2001
2000 Summary:
The research team will be based out of Tuktoyaktuk, and travel to Tuktoyaktuk from Inuvik will be by scheduled flight. No field camps will be used, and all transport in the field will be on foot or by boat. The study will be done through individual and group interviews, using maps and semi-directed interviews. Interviews will be taped, to facilitate data collection. Participation in the study i...
Principal Investigator:Lawson, Nick Licensed Year(s):
2001
Summary:
The objectives of the research team are to collect baseline environmental information on the DeBeers Canada Exploration Ltd. project at Kennady Lake, to assist with the current environmental management of the property and prepare for an assessment of the environmental effects of potential future development of the site. Three field visits to Kennady Lake will be completed during the summer of 200...
Principal Investigator:Mears, Margaret Licensed Year(s):
2000
Summary:
Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...