Principal Investigator:Marsh, Philip Licensed Year(s):
2005
20042003200220012000199919981997199619951994199319921990 Summary:
The primary objective of this project is to improve understanding of the changes in water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek, Hans Creek, and Zed Creek sites will be accessed...
Principal Investigator:de Rham, Laurent Licensed Year(s):
2004
Summary:
It is known that extreme flood levels within the Mackenzie River Basin are caused by ice jamming events. Analysis of open water versus ice influenced water levels at several sites within the Mackenzie River Basin will provide further quantification of th...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Spence, Chris Licensed Year(s):20011999
1998
Summary:
A number of remote meteorological and hydrometric data collection sites will be constructed around Lower Carp Lake. An island on the lake will be used as a base camp. This island will be used to operate an automatic weather station and hydrometric stations and associated camp to support scientific studies of the Canadian GEWEX effort and to provide meteorological data for use in weather forecasts ...