Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Pollard, Wayne H Licensed Year(s):
2006
200520042003 Summary:
Sand, gravel and crushed stone are valuable geological resources, collectively known as aggregates. They are essential bed, foundation and building materials. The presence of massive ice in aggregate deposits results in a series of resource management problems, particularly for the oil industry and its contractors who rely on local granular deposits as building material. From an environmental pers...
Principal Investigator:Murton, Julian B Licensed Year(s):
2005
2001 Summary:
The objectives of this research are to: describe upward growing and downward growing sand wedges; identify the relationships between wind caused sedimentation, deflation and thermal contraction cracking; and, collect samples of sand from wedges and their host material in order to estimate rates of wedge growth.
The fieldwork will be based at two small fly camps at Johnson Bay and Mason Bay. The...
Principal Investigator:Falck, Hendrik Licensed Year(s):
2005
2004 Summary:
Parks Canada would like to expand the existing Nahanni National Park Reserve. Before this can be done, mineral and energy resource assessment (MERA) study is needed for the Greater Nahanni Ecosystem so that mineral deposits or oil fields that could provide jobs and wealth for Northerners and Canadians are not overlooked. This study has five main steps: 1) Review all available bedrock geology ...
Principal Investigator:Christoffersen, Poul Licensed Year(s):2006
2005
Summary:
The objective of this project is to investigate the geologic character of lake sediments in the deep sections of Great Slave Lake using geophysical survey techniques. This project plans on surveying with a Geopulse sub-bottom profiler. This system is mounted on a catamaran sled, which is towed by a small boat. A boomer plate transmits acoustic signals at regular intervals while a string of hydroph...
Principal Investigator:Martel, Edith Licensed Year(s):
2004
Summary:
The mapping team (5-6 researchers) will be flown out by floatplane from Yellowknife in early June and a camp will be established. Island campsites are preferred as a deterrent against bear encounters. With the aid of zodiac-style inflatable boats, the re...
Principal Investigator:Kokelj, Steven V Licensed Year(s):
2004
200320022001200020001999 Summary:
This research will investigate: A) the physical and chemical characteristics of permafrost in the Mackenzie Delta region to identify areas of ice-rich permafrost or thaw sensitive terrain. Second; B) the effect of permafrost degradation on water quality...
Principal Investigator:Kiss, Frank Licensed Year(s):
2003
2002200120001999 Summary:
This survey will improve public knowledge and understanding of the geology of this area, as no publicly available magnetic coverage exists. Survey lines will be flown at a spacing of 880 metres and a 330 metre mean terrain clearance. The purpose of the s...