Principal Investigator:Morrison, Scott Licensed Year(s):2007
2006
20052004 Summary:
Year 2 of this three-year project will entail monitoring sites in the vicinity of both the A154 and A418 mine areas, and investigating sites along the A154 dike (same as those studied in 2005). Hydroacoustic surveys will be conducted during the early morning or evening hours of the first week of September. The actual timing of the surveys can be adjusted depending upon spawning conditions.
The...
Principal Investigator:Uren, Shane Licensed Year(s):2007
2006
Summary:
The field survey of the fish habitat and community of Trudel Creek and a section of the Taltson River will likely take place during one trip in August, although there is the possibility of a second trip to collect additional information. The field team will fly into Fort Smith and then be transported to the Twin Gorges Camp either by plane or helicopter. Rescan will use a local helicopter company ...
Principal Investigator:Tallman, Ross F Licensed Year(s):
2006
Summary:
The goal of this study is to gather information about fish and fish habitat to minimize and monitor impacts associated with the proposed Mackenzie Gas Pipeline. Broad whitefish, inconnu, arctic cisco and lake whitefish are the major fish species taken in subsistence fisheries in the Mackenzie Valley. These species are highly migratory and are targeted by multiple fisheries along their migration ro...
Principal Investigator:Wytrychowski, Scott I Licensed Year(s):
2006
Summary:
Diavik Diamond Mine requires construction of a system of water retention dikes in Lac de Gras to facilitate open-pit mining under dry conditions. The water retention dikes will result in a loss of fish habitat within the footprint of each dike. Diavik Diamond Mines Inc. (DDMI) has received authorization to construct the dikes in Lac de Gras. As a condition of the project’s authorization, Diavik pl...
Principal Investigator:Graf, Linda H Licensed Year(s):2007
2006
Summary:
The anticipated studies include lake bathymetry, fish and fish habitat, and vegetation studies. Measurements of lake depths, surface area and other bathymetric features will determine lakes suitable for water withdrawal during the proposed construction phase of the winter access roads. Bathymetry work will be conducted with a digital echo-sounder linked to a GPS and other supporting equipment. Lak...
Principal Investigator:Hamm, Sharleen Licensed Year(s):2007
2006
Summary:
Exploration efforts at the Damoti Lake property (concentrating on the Horseshoe Zone) are intended to improve gold-bearing ore estimates at the site. As part of the pre-feasibility work, alternatives for tailings disposal will be studied, including depositing tailings into natural water bodies (Lardass Lake, Unnamed Lake, Pond 1 and 2), and/or using land-based methods, such as thickened tailings a...
Principal Investigator:Dessouki, Tarik C E Licensed Year(s):
2006
Summary:
The objective of this survey is to provide conclusive evidence of fish presence/absence and additional stream flow assessments.
Fish will be captured using various techniques. All fish will be held for short duration in a live well, until they have recovered from stress. Biological information such as length, weight, species and health will be collected, and fish will be then be returned to...
Principal Investigator:Rempel, Laura L Licensed Year(s):
2006
2005 Summary:
The aim of this study is to characterize sediment transport processes, including bed scour and fine sediment deposition, in a sub-arctic stream intersected by the proposed Mackenzie Gas Pipeline. The specific objectives of the study are: characterization of surface and sub-surface bed sediment texture for all habitat types; measurement of bed scour depth and transport distance of sediment due to ...
Principal Investigator:Moore, Steve M Licensed Year(s):
2005
Summary:
The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study.
Field s...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2005
Summary:
The Wha Ti Charter Community proposes to develop a run-of-river hydro facility on the La Martre river. The isolated community would like to replace its current diesel generator with a more sustainable, energy efficient and less costly system. An environm...