Fish and Fish Habitat survey of Hill Creek at Highway 3 crossing

Regions: North Slave Region

Tags: biology, fish habitat, fish

Principal Investigator: Dessouki, Tarik C E (1)
Licence Number: 14003
Organization: Dillon Consulting Limited
Licensed Year(s): 2006
Issued: Jun 08, 2006
Project Team: Kerry Brewin (Project Manager/Leader, Dillon Consulting Limited), Joseph Van Humbeck (Fisheries related field work, Dillon Consulting Limited), Tarik Dessouki (Fisheries related field work , Dillon Consulting Limited ), Stephanie Joyce (Fisheries related field work , Dillon Consulting Limited)

Project Description: The objective of this survey is to provide conclusive evidence of fish presence/absence and additional stream flow assessments. Fish will be captured using various techniques. All fish will be held for short duration in a live well, until they have recovered from stress. Biological information such as length, weight, species and health will be collected, and fish will be then be returned to the environment. If individual fish are unable to recover from stress or injury, field staff will euthanize individuals and dispose of them appropriately. A report will be written that can be referenced for future projects of this type. The report will be submitted the the Department of Transportation, Government of the Northwest Territories. The study will be conducted between June 23rd and September 15th at Hill Creek at the Highway 3 crossing (62°44'08.9"N, 115°41'39.8"W), about 25 km SE of Rae and 75 km NW of Yellowknife, 2 km east of Stagg river.