5 dossier(s) trouvé(s) portant l’étiquette "erosion" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Evans, Marlene S. Année(s) de permis:20092008
2007
2006 Résumé:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
chercheur principal:Evans, Marlene S. Année(s) de permis:20092008
2007
2006 Résumé:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
chercheur principal:Miller, Samantha Année(s) de permis:
2003
Résumé:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
chercheur principal:Miller, Samantha Année(s) de permis:
2003
Résumé:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
chercheur principal:Miller, Samantha Année(s) de permis:
2003
2002 Résumé:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...