Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The geotechnical investigation program involves drilling or excavating to collect soil samples at specific sites and the installation of thermal recording devices. Boreholes or excavations will be drilled at approximatley 30-35 sites (22 borrow sites, 4...
Principal Investigator:Melton, Derek Licensed Year(s):
2002
2000 Summary:
The objective of the study is to assess environmental conditions at sites previously developed within the project area, as well as at new development sites proposed for 2002/2003. Information from these surveys will form part of an environmental assessme...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...
Principal Investigator:Evans, Kevin Licensed Year(s):
2002
Summary:
The primary focus of the socio-economic studies will be to identify, collect and verify existing socio-economic baseline information. The specific issues, on which information will be collected, will be determined through consultation with stakeholders a...
Principal Investigator:Evans, Kevin Licensed Year(s):
2002
Summary:
The issues to be addressed in the emissions and air impact assessment portion of the project include: 1) adequacy of baseline emissions, air quality, meteorological and climatological data, as well as air quality and deposition monitoring data, for the B...
Principal Investigator:Hubert, Ben Licensed Year(s):
2002
Summary:
The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...
Principal Investigator:Antoine, Don Licensed Year(s):
2001
Summary:
Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...
Principal Investigator:Komers, Petr Licensed Year(s):
2001
Summary:
Eleven plant species of national significance are found in the Mackenzie Delta. Following a preliminary classification using satellite images, the presence or absence of these species within sample areas will be determined during field surveys. After field data are collected, a more refined landscape classification model will be produced. To refine and test this model, 30 sites per vegetation com...