97 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Northwest Territories Power Corporation Twin Gorges Aquatic Effects Monitoring Plan and Sediment and Erosion Management Plan
Principal Investigator: Byrne, Geraldine
Licensed Year(s): 2013
Summary: The Aquatic Effects Monitoring Plan (AEMP) and Sediment and Erosion Management Plan (SEMP) are requirements under water license MV2011L0002 issued by the Mackenzie Valley Land and Water Board (MVLWB). The objective of the AEMP is to monitor and identify potential short-term, long-term and cumulative changes throughout the Taltson River aquatic environment. The objective of the SEMP is to identify...


Proposed Aklavik West Road and Bridge - Hydrotechnical and Geotechnical Field Investigations
Principal Investigator: Kors-Olthof, Rita I
Licensed Year(s): 2014 2011
Summary: The goals of the hydrotechnical research are to: - learn if there are possible problem areas due to water or ice along the proposed road; - choose the best proposed bridge location so that a new bridge won't wash out like the temporary one does; and - decide on length of bridge so that abutment locations can be chosen for later geotechnical drilling sites. The goals of the geotechnical resea...


Renewable energies: Design and Testing Zero-head Micro hydro turbine,Solar/Hydrogen fuel cell testing
Principal Investigator: Mutua, Daniel
Licensed Year(s): 2010
Summary: Objectives are to: 1. Design and test zero-head hydro-electric turbines under low flow, i.e. less than 1 m/sec velocity, for the purpose of utilizing locally available renewable hydro resources; 2. Solar/Hydrogen fuel cell testing; 3. Evaluate the feasibility of an NWT-based commercial venture to manufacture and sell these turbines, and/or integrated energy systems. In rivers where ther...


In-Stream Turbines for N'dulee Crossing Ferry Camp
Principal Investigator: May, Glenn
Licensed Year(s): 2010
Summary: The objectives of this study are: 1. To evaluate the use of hydrokinetic power generation in the Northwest Territories for use in off-grid applications, 2. To demonstrate cost-savings and reduction of greenhouse gas emissions power for a ferry camp (N'dulee Crossing, about 80 km WNW of Fort Simpson on the way to Wrigley), 3. Based on the results of the N'dulee crossing operation in 2010, evalua...


Lutsel K'e Mini Hydro Project
Principal Investigator: Cote, Jason E
Licensed Year(s): 2010 2009
Summary: The objectives of this project are to: - Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling. - Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...


Land Use and Regulatory Permitting - Trout Lake Airport
Principal Investigator: Koke, Paul E
Licensed Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Trout Lake Airport. As a result, it is required that a L...


Land Use and Regulatory Permitting - Colville Lake Airport
Principal Investigator: Koke, Paul Koke E
Licensed Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Colville Lake Airport. As a result, it is required that a...


Environmental Screening of the Inuvik Airport Runway Extension
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2009
Summary: The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...


Proposed ConocoPhillips Canada (North) Limited Parsons Lake Gas Field Summer 2007 Access Research Program
Principal Investigator: Henderson, Bob C.
Licensed Year(s): 2007
Summary: The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...


MGM Energy Corp. 2007, 2008 and 2009 Summer Field Assessment and Advance Barge Project (the Project)
Principal Investigator: Maaskant, Shirley
Licensed Year(s): 2009 2007
Summary: This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...


TOTAL PAGES: 10