Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be by helicopte...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:English, Michael C Licensed Year(s):20032002
2001
2000 Summary:
The crew will fly from Yellowknife to the Tundra Ecosystem Research Station camp on Daring Lake from BHP (Ekati Mine) by helicopter. The research team itinerary consists of: (1) setting up the camp; (2) sampling all of the major streams flowing into Daring Lake for chemistry and instantaneous flow; (3) walking through several basins to decide on an intensive sampling site; and (4) installing dri...
Principal Investigator:Kalich, Laura Licensed Year(s):
1996
Summary:
The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...