Principal Investigator:Cunada, Christopher Licensed Year(s):
2023
2021 Summary:
This licence has been issued for the scientific research application No.5339.
The objectives of this project are to collect additional samples for fish health and fish contaminant levels, and to track their status over time to assess ecosystem health and provide an indication of change or stress in the environment.
The research team will be sampling the same species of fish that were investi...
Principal Investigator:Low, Mike Licensed Year(s):
2021
201920182017 Summary:
This licence has been issued for the scientific research application No.4844.
The objectives of this study are to:
1) establish a population estimate of walleye in Sanguez Lake;
2) establish an additional estimate of fish mercury concentrations in walleye and pike. In 2013, mean mercury concentration in walleye was 0.71 mg/kg wet weight, and in pike was 1.09 mg/kg wet weight;
3) reduce the n...
Principal Investigator:Hovel, Rachel A Licensed Year(s):2021
2019
Summary:
The objective of this project is to maintain a community-based monitoring program in the communities of Fort McPherson, Aklavik, and Tsiigehtchic.
Data collected in this community-based monitoring program and other previous research has shown that ocean-migrating broad whitefish use the Peel River as spawning habitat, and that these fish also make extensive migrations between rivers in the lowe...
Principal Investigator:Mochnacz, Neil Licensed Year(s):
2019
Summary:
The first phase of this field program was implemented in 2018, where approximately twenty loggers were deployed and retrieved. A minimum sample size of seventy is required to build a robust stream temperature model. The research team propose to deploy July 14-15 and retrieve August 29-30 the remaining temperature loggers (n = 50) across the Fish Creek watershed. This data will be used to develop a...
Principal Investigator:Machtans, Hilary Licensed Year(s):
2019
Summary:
The main objective of the study is to implement a one-year environmental monitoring program to support a 2019 water licence application as well as associated regulatory requirements.
Three studies will be done in 2019:
a) Phase 6 Environmental Effects Monitoring (EEM) program;
b) Fish tissue; and,
c) Fish presence/absence, habitat survey and benthos sampling.
The Ninespine Stickleback su...
Principal Investigator:Low, George Licensed Year(s):
2018
2017 Summary:
It is the objective of this project to collect information on the walleye population from the Horn River which can be used for managing the fishery and possibly changing the regulations. In order to reach this objective the following goals have been set out:
1. to collect population structure and spawning information by setting gill nets of varying mesh size and biologically sampling a portion of...
Principal Investigator:Tallman, Ross F Licensed Year(s):
2017
Summary:
The objective is to use Inconnu genetic samples to differentiate the inconnu populations residing in Great Slave Lake. If inconnu are philopatric (return to their natal spawning grounds) than each river should consist of a genetically distinct population.
Methods include using gill nets to capture between 30 to 50 Inconnu per location (along Buffalo River, Buffalo Lake and Taltson River). Nets...
Principal Investigator:Panayi, Damian Licensed Year(s):2018
2017
2016201520142013201220112010 Summary:
The objective is to describe the aquatic environment in the Yellowknife River between Bluefish Lake and Prosperous Lake as per the Fisheries Authorization and the Water Licence. This may include investigating aquatic vegetation, water quality and quantity, benthic invertebrates, fish and substrate. The results will be used to determine the most suitable means of fish habitat compensation or produc...
Principal Investigator:Ruben, Diane Licensed Year(s):2017
2016
Summary:
The objectives of the research are to conduct an assessment of whitefish diet and contaminants.
Two technicians will collect approximately 60 samples over 7 days at Billy’s Creek in July 2016 and an additional 60 samples at the Hornaday River in August and October 2016. Data will be collected on: species, location, date/time, catch-effort/gear type, length, weight, sex, maturity, otolith, stom...
Principal Investigator:Low, George Licensed Year(s):2016
2015
2014 Summary:
The primary objective of this project is to enhance Providence Creek to increase arctic grayling (Thymallus arcticus) spawning habitat. This will be done by removing beaver dams which have been shown to decrease usable spawning habitat, and to create new spawning habitat with gravel and boulders.
Another objective of the project is to monitor the arctic grayling population to determine if the ...