6 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pine Point Railbed ESA
Principal Investigator: Nearing, Michelle
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5047. The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...


De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Tammerlane Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2006
Summary: The objective is to obtain sufficient baseline data to develop a lead and zinc mine adjacent to the old Pine Point property. The owl survey to identify species presence and breeding territories in the vicinity of the study area will include an evening broadcast-call program that will commence 0.5 hours after sundown to 0.5 hours before sunrise in April and May. This owl survey will target the Bor...


Gahcho Kue' Biophysical Baseline Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...


TOTAL PAGES: 1