141 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Petrogenesis of the Blachford Lake Intrusive Suite
Principal Investigator: Mumford, Thomas R.
Licensed Year(s): 2011 2010
Summary: With increasing activity at the Nechalacho Rare Earth Element Deposit a better geological understanding of the setting of the mineral deposit is required. This study is fundamentally concerned with how and why the deposit exists. This is achieved by studying the entire Blachford Lake intrusive suite (>300 km2), the igneous system which generated the deposit. From this, a petrogenetic framework wil...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


Geological carbon in the Mackenzie River Basin: Sources and sinks of atmospheric carbon dioxide
Principal Investigator: Hilton, Robert G
Licensed Year(s): 2017 2013 2011 2010 2009
Summary: The overall aim is to assess the carbon balance of the Mackenzie River Basin and to place constraints on the role of climatic and physical erosion processes in driving carbon dioxide source and sinks to the atmosphere and oceans. More specifically, the researchers aim to quantify the amount of chemical weathering that takes place in the Mackenzie River Basin; to quantify how much weathering of sil...


Arctic Wastewater Research
Principal Investigator: Challen Urbanic, Jane
Licensed Year(s): 2012 2011 2010 2009
Summary: The objective of this research is to assess the performance of lagoons and wetlands in the treatment of municipal wastewater in Canada's Arctic. A secondary objective is to determine the occurrence of trace contaminants in northern wastewaters. Samples will be taken from the influent (raw sewage) and effluent (treated wastewater) select wastewater systems. Samples will be taken during the perio...


HT Hydro Hydrology Monitoring Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: NT Hydro is in the process of characterizing the hydro potential of the NWT, and the hydrological information collected from the four gauging sites will be used to determine if any hydro potential exists on these four rivers. These gauges are not being installed in relation to development of a specific hydro project on these water bodies. Installation of the gauging stations: Hydrometric g...


Combined Phase I/II ESAs for Five Sites
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2010
Summary: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


Paleomagnetism of East Arm of Great Slave Lake
Principal Investigator: Mitchell, Ross E.
Licensed Year(s): 2010
Summary: The goals of this research project are to: 1) Re-sample previously sampled strata that have yielded evidence for geographic shifts. 2) Sample previously unsampled strata in between previously sampled units in order to capture more continuous record of Slave province's geographic whereabouts. 3) Sample several parallel (or repeat) stratigraphic sections in order to demonstrate that we can ...


Lutsel K'e Mini Hydro Project
Principal Investigator: Cote, Jason E
Licensed Year(s): 2010 2009
Summary: The objectives of this project are to: - Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling. - Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...


Yellowknife Gold Project 2009 Hydrometeorological Survey
Principal Investigator: Draho, Bob
Licensed Year(s): 2010 2009
Summary: This licence is being issued for the scientific research application No. 1120. The objectives of this four day field survey is to: 1) Inspect the 4 hydrology and 1 meteorology stations to ensure they are in working order; 2) Repair stations, if required; and 3) download site-specific weather and stream flow data from the stations. Equipment at each hydrostation consists of a datalogger (to r...


TOTAL PAGES: 15