3 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Hay River Ice Jam Study
Principal Investigator: Hicks, Faye E
Licensed Year(s): 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004
Summary: The objective of the study is to develop new and updated ice jam flood forecasting models for the Town of Hay River. Researchers will observe the daily progression of river ice breakup from small aircraft (going along with the Town Flood Watch Committee...


Paleohydrological and Paleoecological Reconstruction of the Mackenzie Basin Deltas
Principal Investigator: Wolfe, Brent BBW
Licensed Year(s): 2007 2006 2005 2004 2003 2002
Summary: This project will formulate a history of the frequency and magnitude of floods and droughts and corresponding ecological responses in the Mackenzie Basin deltas over the past 1000 years. Fieldwork in 2003 will focus on assessing seasonal variability of l...


Northern River Ice Regimes
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1993 1992 1991 1990 1988
Summary: Ice gauges are installed on river ice once the ice is strong enough to support researchers (20 gauges for the Mackenzie Delta and 15 gauges for Hay River). These gauges are read every 10 days to obtain total ice thickness, white ice thickness and snow depth. From these data, the rates of ice growth and decay can be calculated, and the approximate date of maximum ice thickness can be determined....


TOTAL PAGES: 1