28 Dossier(s) trouvé(s) à l’emplacement "Région du Slave Sud" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Assessment of Groundwater Conditions at the Former Weather Station in Fort Reliance, NWT
chercheur principal:
Année(s) de permis: 2014
Résumé: The objective of the groundwater investigation is to confirm the presence or absence of contamination and to determine the risk associated with contaminated groundwater infiltration into the lake (if applicable). This work will include installing five to six monitoring wells at the site in the area adjacent to the Great Slave Lake. A secondary objective is to inspect the fuel storage tanks located...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
chercheur principal:
Année(s) de permis: 2011 2010 2009
Résumé: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


Arctic Wastewater Research
chercheur principal:
Année(s) de permis: 2012 2011 2010 2009
Résumé: The objective of this research is to assess the performance of lagoons and wetlands in the treatment of municipal wastewater in Canada's Arctic. A secondary objective is to determine the occurrence of trace contaminants in northern wastewaters. Samples will be taken from the influent (raw sewage) and effluent (treated wastewater) select wastewater systems. Samples will be taken during the perio...


HT Hydro Hydrology Monitoring Program
chercheur principal:
Année(s) de permis: 2011 2010
Résumé: NT Hydro is in the process of characterizing the hydro potential of the NWT, and the hydrological information collected from the four gauging sites will be used to determine if any hydro potential exists on these four rivers. These gauges are not being installed in relation to development of a specific hydro project on these water bodies. Installation of the gauging stations: Hydrometric g...


Yellowknife Gold Project 2009 Hydrometeorological Survey
chercheur principal:
Année(s) de permis: 2010 2009
Résumé: This licence is being issued for the scientific research application No. 1120. The objectives of this four day field survey is to: 1) Inspect the 4 hydrology and 1 meteorology stations to ensure they are in working order; 2) Repair stations, if required; and 3) download site-specific weather and stream flow data from the stations. Equipment at each hydrostation consists of a datalogger (to r...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project – Groundwater Hydrology and Hydrogeology
chercheur principal:
Année(s) de permis: 2009
Résumé: The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...


Slave River Hydro Development
chercheur principal:
Année(s) de permis: 2008
Résumé: This licence is issued for the scientific research application # 926. The goal of this river geomorphology program is to describe the Slave River’s channel landforms and sediment characteristics and assess the sensitivity of these river landforms to potential changes in stream hydrology. Field visits will include a reconnaissance flight via helicopter along the Slave River (from Fort Smith ...


Tyhee Hydrology and Meteorology Data Collection Project
chercheur principal:
Année(s) de permis: 2007
Résumé: The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...


Gahcho Kue Project - Hydrology Baseline Work
chercheur principal:
Année(s) de permis: 2007 2004
Résumé: The overall objective of this project is to collect additional information from Kennady Lake and the surrounding watershed for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project. De Beers Canada Inc. has been conducting hydrology baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to t...


Hydrometric Survey and Meteorological Station Installation and Monitoring - Matthews Creek, NT
chercheur principal:
Année(s) de permis: 2007 2006
Résumé: The objectives of the hydrological program are to collect and store creek-discharge data in conjunction with creek-stage elevations in order to increase the accuracy of the stage-discharge relationship and prepare a time history of flow. The objectives of the meteorological program are to install instrumentation to collect site-specific meteorological data and to begin a site monitoring program. ...


TOTAL PAGES: 3