41 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Monitoring Water Levels in the Slave River Delta, NWT
Principal Investigator: English, Michael C
Licensed Year(s): 2001
Summary: The research team will be based in Ft. Resolution. Transportation includes aircraft from Toronto to Edmonton to Hay River. Transportation in the field will be by truck and boat. The research team will operate from a base camp previously established on Steamboat Channel (a camp we originally established in 1977 when this work originally started). Water level recorders will be established at six sit...


Channel Morphology Studies: Slave River Delta
Principal Investigator: English, Michael C
Licensed Year(s): 2000 1996 1995
Summary: The field crew will live on the delta for approximately 8-9 weeks at a site established by the principal investigator in 1997 on Steamboat Channel. Transportation will be by boat. Three channels will be studied in detail. At each study site the researchers will measure the speed of the flow using an electronic velocity meter, measure the cross sectional profile of the channel with tape and rod ...


Trace Organic Contaminants in Arctic Snow and Aquatic Ecosystems
Principal Investigator: Gregor, Dennis J.
Licensed Year(s): 1992 1991 1991 1990
Summary: Snow samples will be collected from approximately 30 sites across the NWT and Yukon in the spring of the year. This annual snow pack sample will allow an estimate of the quantity of organic contaminants that have been deposited over the winter season. To better understand the fate of these contaminants in the High Arctic, the researchers will undertake an intensive small basin study on Cornwallis ...


Licence #5141
Principal Investigator: Spencer, Richard
Licensed Year(s): 1985
Summary: Collect biophysical information for permit applications (water, land use, surface lease)....


Licence #2649
Principal Investigator: Noton, Leigh
Licensed Year(s): 1981
Summary: To carry out a water sampling program to establish baseline data on prevailing conditions as part of a program to assess the possible impact of hydro-electric development in the area....


Licence #2576
Principal Investigator: Noton, Leigh
Licensed Year(s): 1980
Summary: To undertake a water sampling program, upstream and downstream of the proposed Slave River Hydro development, to assist in assessing the general impact of this project....


Licence #2317
Principal Investigator: Bednarski, Jan
Licensed Year(s): 1978
Summary: To study the snow pack including snow density, depth, water equivalence, stratigraphy and ice composition....


Licence #2275
Principal Investigator: English, Michael C
Licensed Year(s): 1978
Summary: Observation of break-up on the Slave River Delta. Measurement of snow depth, density, water equivalence and snow layering before Break-up....


Licence #2021
Principal Investigator: Sherstone, D.A.
Licensed Year(s): 1976
Summary: 1) To acquire aerial photography of hydrologic characteristics of the Mackenzie and Lower Liard River basins. 2) To acquire photography of environmentally sensititve areas along the Central Arctic gas pipeline route. 3) To acquire aerial photography of glacier research sites in the Arctic Islands area (particularly ...


TOTAL PAGES: 5