7 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Environmental Studies for EL470 - 5yr
Principal Investigator: Belland, Darlene
Licensed Year(s): 2017 2016 2015 2014 2013 2012
Summary: The objective of this project is to conduct ongoing monitoring and assessment programs, including areas in the Mackenzie River Special Management Zone (SMZ), for surface water. Surface water samples will be collected from selected lakes, ponds, rivers, and streams. Selected water bodies in EL470 have already undergone bathymetric assessment and sampling. ConocoPhillips will communicate, in ...


Great Bear River Environmental and Traditional Knowledge Baseline Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...


Phase II Environmental Site Assessment of ten (10) site along the Canol Trail (NM050)
Principal Investigator: Hadley, Katherine
Licensed Year(s): 2009
Summary: The purpose of the Phase II ESAs is to further determine the current environmental and physical conditions at 10 sites along the Canol Trail and to reduce data gaps and allow development of the appropriate remediation strategies and costs. This will include the identification and quantification of environmental impacts to soil, sediment, surface water and groundwater, as well as the identificatio...


MacTung Project Environmental Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007 2006
Summary: The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project. Overland t...


Non-renewable Resource Assessment (Phase II Fieldwork), Edacho
Principal Investigator: Gal, Leonard
Licensed Year(s): 2003 2002
Summary: The objective of the fieldwork is to further assess the non-renewable resource potential of the Edacho area, as a follow-up to Phase I work which was a review of existing data. This assessment is being carried out as part of the Northwest Territories Pro...


Environmental Assessment for AEC's proposed oil and gas development activities in the Sahtu, NWT
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide information on fish habitat and wildlife in the area of three exploratory petroleum well sites and along their respective access routes in the Fort Liard/Nahanni Butte area. Researchers will travel to the well sites and along access routes sites by helicopter with survey work carried out by air, small boat and on foot. Fish habitat and water quali...


Assessment of Stream Crossings for Planned Improvements to the Mackenzie Valley Winter Road.
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...


TOTAL PAGES: 1