10 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Impacts of Oil and Gas Activity on the Peoples in the Arctic Using a Multiple Securities Perspective
Principal Investigator: Elliott, Milissa A
Licensed Year(s): 2008
Summary: This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling. Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...


2004 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


Vegetation, Forestry and Soils Surveys: Sahtu Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...


Ecological and geomorphological investigations in the alpine tundra of the Mackenzie Mountains, NWT.
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993
Summary: The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...


Canol Pipeline environmental study
Principal Investigator: Reimer, K.J.
Licensed Year(s): 1993
Summary: The Environmental Sciences Group has been requested by Indian and Northern Affairs to conduct an environmental study of the Canol Pipeline. The study will identify contaminants (especially hydrocarbons) along the Canol Trail associated with the construction and startup of the pipeline. Where spills are evident, data will be collected on soils, water, vegetation and stream invertebrates to determ...


Digital Database of Vegetation Types of the Mackenzie Valley Development Corridor
Principal Investigator: Squires Taylor, Cindy
Licensed Year(s): 1992 1991
Summary: The Researcher will conduct a survey, approximately 30 km on either side of the Mackenzie River using satellite imagery. A classification will be undertaken of the area from the Mackenzie Delta to the Fort Simpson area, with wider zones along the east side to include proposed pipeline routes. The information can be plotted as colour maps to show the location of trap lines, forest fires or wildlife...


Licence #2416
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 1979
Summary: To evaluate the impacts of the Canol Project (1942-45) upon the topography and plant communities and to determine the natural rehabilitation of disturbed sites....


Licence #2330
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 1978
Summary: To evaluate the impacts of the Canol Project (1942-45) upon the topography and the plant communities and to determine the rehabilitation of disturbed sites....


Licence #2121
Principal Investigator: Hutchinson, Tom
Licensed Year(s): 1977
Summary: To determine the degree of recovery of crude oil spills made in 1972 and 1973 on taiga at Norman Wells and tundra at Tuktoyaktuk. To determine the effects of a 1975 diesel oil spill on taiga at Norman Wells and to compare the effects with crude oil spills made in comparable terrain. To examine the pattern of vegetational recovery of these areas. To examine the effects of crude oil spills made o...


TOTAL PAGES: 1