6 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


2005 Route and Site Reconnaissance in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2004 Summer Reconnaissance Program in the Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004
Summary: The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...


2004 Summer Reconnaissance Program in the Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. At this time, a...


Reconnaissance Surveys to Select Sample Sites for Detailed Biophysical Surveys in the Sahtu Settlement Area
Principal Investigator: Green, Jeff
Licensed Year(s): 2001
Summary: The proposed research program will be carried out on Crown Lands located within the Sahtu Settlement Area. The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys on Crown Lands located within the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections. Helicopters...


Preliminary Reconnaissance of Wildlife and Vegetation of the Proposed Sahyoue/Edacho National Historic Park, Edacho Portion, Great Bear Lake, NT.
Principal Investigator: Moore, Steve M
Licensed Year(s): 2002 2001 2000
Summary: This study will gather baseline information on wildlife and vegetation to help fulfill step 5 of the protected areas strategy process. Two people (Steve Moore and one guide from Deline) will travel by boat from Deline to Edacho Peninsula and spend six days collecting baseline information on wildlife and ecosystem units. Thirty-six sites will be assessed and classified to ecosystem type. For eac...


TOTAL PAGES: 1