4 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Great Bear River Seismic Test Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006
Summary: The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location. S...


2004 Spring Break-up Watercourse Investigation Program - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 1