Principal Investigator:Smith, Sharon S Licensed Year(s):2023
2022
202120202019 Summary:
This licence has been issued for the scientific research application No.5181.
The combined temperature and active layer monitoring network extends from Fort Simpson to the Arctic Coast. With monitoring instrumentation already in place through work under previous licenses, the main work of this phase will be data collection. While different parts of the network can be visited at different times ...
Principal Investigator:Corriveau, Louise Licensed Year(s):
2011
20102009 Summary:
The objectives of the Great Bear/IOCG geoscience research and mapping project are to:
• develop a modern geological, crustal architecture and exploration framework for polymetallic iron oxide-copper-gold (IOCG) deposit-type mineralizing systems in the Great Bear magmatic zone and new exploration methods for IOCG deposits in glaciated terrains;
• validate deposit-type model for known mineral occu...
Principal Investigator:Skelton, Jennifer Licensed Year(s):
2007
Summary:
The Northwest Territories contains numerous unique landforms known as karst topography. The objective of this study is to know the locations and characteristics of karst sites in the Sahtu, providing information for environmental assessment of future developments and for land-use planning. Karst topography is an unique landform; the environmental impacts on the land and water of various land uses...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be performed by...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Couture, Rejean Licensed Year(s):2006
2005
Summary:
The main objectives of the field reconnaissance at landslide sites are as follows:
o To visit landslide sites that exhibit on-going movement in order to qualify the rate of movement;
o To identify main failure mechanisms and factors that contributed to slope failures;
o To validate previous data collected through airphoto interpretation and remote sensing techniques;
o To collect soil samples ...
Principal Investigator:Falck, Hendrik Licensed Year(s):
2005
2004 Summary:
Parks Canada would like to expand the existing Nahanni National Park Reserve. Before this can be done, mineral and energy resource assessment (MERA) study is needed for the Greater Nahanni Ecosystem so that mineral deposits or oil fields that could provide jobs and wealth for Northerners and Canadians are not overlooked. This study has five main steps: 1) Review all available bedrock geology ...
Principal Investigator:Nichol, Susan L. Licensed Year(s):
2005
Summary:
The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Gal, Leonard Licensed Year(s):
2003
2002 Summary:
The objective of the fieldwork is to further assess the non-renewable resource potential of the Edacho area, as a follow-up to Phase I work which was a review of existing data. This assessment is being carried out as part of the Northwest Territories Pro...