9 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Bosworth Creek Aquatics and Fisheries Monitoring Program
Principal Investigator: Blaschuk, Katherine
Licensed Year(s): 2011 2010 2009
Summary: WorleyParsons, on behalf of Imperial Oil, is planning to initiate a benthic invertebrate and fisheries assessment program for the portions of Bosworth Creek adjacent to the Imperial Oil operations in Norman Wells, NWT. The objective of the project is to characterize biophysical conditions in Bosworth Creek in the area surrounding the lower Bosworth Creek Bridge; both upstream and downstream from t...


Impacts of Oil and Gas Activity on the Peoples in the Arctic Using a Multiple Securities Perspective
Principal Investigator: Elliott, Milissa A
Licensed Year(s): 2008
Summary: This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling. Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...


2003 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


2003 Spring, Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


Grey Wolf Norman Wells Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: Golder Associates was contracted on behalf of Grey Wolf Exploration to conduct preliminary baseline studies at Grey Wolf's proposed well sites. The objective of this study is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project site. A literature search for registered archaeological sites within the proposed site is also planned. Golder Associates was c...


Wildlife and Fisheries Habitat Survey at Ranger Oil's Exploratory Drilling Project near Tulita (Fort Norman).
Principal Investigator: Melton, Derek
Licensed Year(s): 1997
Summary: Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...


Digital Database of Vegetation Types of the Mackenzie Valley Development Corridor
Principal Investigator: Squires Taylor, Cindy
Licensed Year(s): 1992 1991
Summary: The Researcher will conduct a survey, approximately 30 km on either side of the Mackenzie River using satellite imagery. A classification will be undertaken of the area from the Mackenzie Delta to the Fort Simpson area, with wider zones along the east side to include proposed pipeline routes. The information can be plotted as colour maps to show the location of trap lines, forest fires or wildlife...


Licence #1908
Principal Investigator: Whitney, Paul
Licensed Year(s): 1975
Summary: Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....


TOTAL PAGES: 1