5 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Northern Phase 1 Environmental Assessment Program - Remote Sensing Pilot Project
Principal Investigator: Neufeld, Lori
Licensed Year(s): 2009
Summary: WorleyParsons, on behalf of Imperial Oil, is planning to conduct a remote sensing pilot project through use of a fixed-wing aircraft to capture environmental information on approximately 100 former drilling sites, as well as some former staging areas, campsites, artificial islands in the Beaufort Sea and other facilities located in the Northwest Territories. The purpose of the project is to determ...


2003 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2002 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...


Ecological and geomorphological investigations in the alpine tundra of the Mackenzie Mountains, NWT.
Principal Investigator: Kershaw, G. Peter
Licensed Year(s): 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993
Summary: The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...


TOTAL PAGES: 1