Principal Investigator:Belland, Darlene Licensed Year(s):
2017
20162015201420132012 Summary:
The objective of this project is to conduct ongoing monitoring and assessment programs, including areas in the Mackenzie River Special Management Zone (SMZ), for surface water.
Surface water samples will be collected from selected lakes, ponds, rivers, and streams. Selected water bodies in EL470 have already undergone bathymetric assessment and sampling.
ConocoPhillips will communicate, in ...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (north) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The geotechnical investigation program involves drilling or excavating to collect soil samples at specific sites and the installation of thermal recording devices. Boreholes or excavations will be drilled at approximatley 30-35 sites (22 borrow sites, 4...