11 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

How are changes on the land affecting water resources around Fort Good Hope and Ts’ude Niline Tuyeta?
Principal Investigator: Comte, Jerome
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5646. This project proposes to evaluate responses of aquatic ecosystems to permafrost thaw, lake drying, and wildfire, as well as their cumulative impacts. The researchers will characterize lake chemistry and biological diversity (microbes and invertebrates) in water (current environmental change) and in sediments (histori...


NWT-wide Community based Water Quality Monitoring
Principal Investigator: Somers, Gila L
Licensed Year(s): 2024 2023 2022
Summary: This licence has been issued for the scientific research application No.4762. Water Quality Monitoring equipment is deployed at over 40 sites across the NWT to address community concerns. Community members were trained to use the following equipment: • Sondes: sit in the water and measure basic water quality parameters every 2 hours for up to 3 months. Analysis undertaken at Environment and...


Aquatic ecosystems in the Fort Good Hope area as indicators of environmental change
Principal Investigator: Comte, Jerome
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4823. The purpose of this work is to identify indicators of aquatic ecosystem health i.e., organisms such as bacteria, phytoplankton and invertebrates that are sensitive to environmental forces and play key role in aquatic food webs, to monitor and predict the response of aquatic ecosystems to environmental changes (e.g. pe...


Planning for Climate Change Impacts on the Aquatic Ecosystems of Great Bear Lake and its Watershed
Principal Investigator: Nesbitt, Lorien
Licensed Year(s): 2011
Summary: The organizations leading this project represent claim participants in the Deline District. The project will thus be directed by organizations representing the local community, such as the Déline First Nation (DFN), and The Déline Renewable Resources Council (DRRC). The objectives of this research project are: a. to develop a research gap analysis and climate change vulnerability assessment f...


Bosworth Creek Aquatics and Fisheries Monitoring Program
Principal Investigator: Blaschuk, Katherine
Licensed Year(s): 2011 2010 2009
Summary: WorleyParsons, on behalf of Imperial Oil, began a benthic invertebrate and fisheries assessment program for the portions of Bosworth Creek adjacent to the Imperial Oil operations in Norman Wells, NWT. The objective of the project is to characterize biophysical conditions in Bosworth Creek in the area surrounding the lower Bosworth Creek Bridge; both upstream and downstream from the location of a f...


Biological Studies of Waters Along the Proposed Mackenzie Gas Project Pipeline Route - Sahtu Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2008
Summary: The research will examine streams possibly affected by the proposed Mackenzie Gas Project pipeline, and streams that can serve as future control/reference sites. Measurements of stream nutrients, metals in stream water, water quality (DO, pH, conductivity, etc.), stream characteristics (flow, width, depth, etc.) and aquatic invertebrate abundance/species composition will be completed. Possible t...


Bosworth Creek Monitoring Project
Principal Investigator: Guthrie, Glen H
Licensed Year(s): 2011 2010 2009 2008 2007 2006
Summary: This licence was issued for the scientific research licence application number 794. The aim of this study is to provide practical scientific skills to local youth and conduct long term monitoring of the creek system. The project will provide professional development for the team. Baseline data will be acquired on the chemical components of the creek system, sampling in accordance with instru...


Assessment of lake trout stocks in Great Bear Lake
Principal Investigator: Howland, Kimberly
Licensed Year(s): 2007 2006 2005
Summary: Two projects will be conducted on Great Bear Lake. The first is a continuation of the lake-wide assessment of the stock structure, population characteristics and movements of lake trout involving the collection of up-to-date data from Dease, Smith, McTavish and McVicar Arms (last assessed in the early 1980’s). Smith Arm (66° 20’ N, 123° 16’ W, 280 km from Deline) will be studied in 2006. Data has ...


Norman Wells Aquatic Effects Monitoring Program - plume delineation study
Principal Investigator: Fraikin, Chris
Licensed Year(s): 2005 2004
Summary: A field dye tracer study will be conducted to examine the mixing and dispersion characteristics of discharges from Imperial Oil, Norman Wells, to the Mackenzie River. This will be accomplished by injecting dye at the water release point under normal discharge conditions and measuring dye concentration at several river transects downstream of the discharge. The concentration profile at these tran...


Fish Habitat Creation Study, Lutsel K'e and Deline, NWT
Principal Investigator: d'Entremont, Marc
Licensed Year(s): 2004
Summary: The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...


TOTAL PAGES: 2