Principal Investigator:Hamm, Sharleen Licensed Year(s):2007
2006
Summary:
Exploration efforts at the Damoti Lake property (concentrating on the Horseshoe Zone) are intended to improve gold-bearing ore estimates at the site. As part of the pre-feasibility work, alternatives for tailings disposal will be studied, including depositing tailings into natural water bodies (Lardass Lake, Unnamed Lake, Pond 1 and 2), and/or using land-based methods, such as thickened tailings a...
Principal Investigator:Weagle, Ken V Licensed Year(s):2007
2006
Summary:
The hydrometric program for 2006 will be a continuation of the program from 2005, which focussed on wildlife and wildlife habitat surveys, water quality sampling and hydrological monitoring at Matthews Creek. The program will be based on four site visits over the summer. The stage-discharge observations will be conducted on a single creek transect that was established in 2005.
The first site v...
Principal Investigator:Ford, Bruce S Licensed Year(s):
2005
Summary:
This study involves fish sampling to determine relative abundance and levels of mercury and other metals in fish tissue in Giauque Lake, Thistlethwaite Lake and Control Lake A, as well as benthic invertebrate sampling and water quality sampling in the three lakes to complement the fish sampling. 3 sites in Giauque, 3 in Thistlethwaite and one in Control Lake A will be recorded. Captured fish will ...
Principal Investigator:McCullum, John Licensed Year(s):
2005
Summary:
The purpose of this study is for the communities most affected by the mining operation of Diavik Diamond Mines Inc. (DDMI) to be able to collect and apply traditional knowledge to assess southern caribou migration, water quality and the quality of Lac de Gras fish before, during, and after mining operations.
A Helicopter, float planes, and boats will be used to transport equipment and individ...
Principal Investigator:McGurk, Michael Licensed Year(s):
2005
2004 Summary:
The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...
Principal Investigator:Weagle, Ken V Licensed Year(s):
2005
2004 Summary:
The purpose of this study is to collect environmental baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board for the development of a gold mine at the Seabridge Gold Inc. property. The components of the program u...
Principal Investigator:Bekhuys, Tim Licensed Year(s):2006
2005
Summary:
De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...
Principal Investigator:Granchinho, Sophia Licensed Year(s):
2004
Summary:
BHP Billiton has retained Rescan Environmental Services Ltd. to conduct a baseline aquatic and fisheries survey of lakes near the Fox Pit in the Koala Watershed on the EKATI claim block. The Fox Pit is the newest pit being constructed at EKATI. The wast...
Principal Investigator:Goad, Robin E Licensed Year(s):
2004
Summary:
Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...
Principal Investigator:Schryer, Richard P Licensed Year(s):
2004
2003 Summary:
Under the new Metal Mining Effluent Regulations (Fisheries Act), an Environmental Effects Monitoring (EEM) program is required to determine the effects of mine effluent on fish and fish habitat. As part of the study, water quality and aquatic organism he...