Principal Investigator:Wright, Stephanie Licensed Year(s):2024
2023
2022 Summary:
This licence has been issued for the scientific research application No.5522.
The purpose of this study has four objectives: 1) Assess the spatial and temporal patterns of hydrologic change (groundwater and surface water) in the La Martre River and Trout River catchments (O1); 2) Identify the drivers, processes, and feedbacks responsible for the hydrologic changes identified in O1 and how they ...
Principal Investigator:Terlaky, Viktor Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5000.
This year's field project has the objective to obtain accurate temperature measurement of the water in the mine at various depths. The measurements will be used to refine the analytical and numerical models for geothermal energy potential estimate of the mine. The more accurate measurements are taken, the better refin...
Principal Investigator:Walmsley, Caroline Licensed Year(s):
2020
2019 Summary:
This licence has been issued for the scientific research application No.4710.
The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements.
Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...
Principal Investigator:English, Michael C Licensed Year(s):20032002
2001
2000 Summary:
The crew will fly from Yellowknife to the Tundra Ecosystem Research Station camp on Daring Lake from BHP (Ekati Mine) by helicopter. The research team itinerary consists of: (1) setting up the camp; (2) sampling all of the major streams flowing into Daring Lake for chemistry and instantaneous flow; (3) walking through several basins to decide on an intensive sampling site; and (4) installing dri...