24 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Yellowknife Lithium Project Environmental Consulting Services
Principal Investigator: Brezenski, Jeff
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5636. The purpose of the baseline program field studies is to: characterize existing conditions in the project vicinity and surrounding region to support project planning, permitting, and development of a proposed lithium mine. One continuous air quality monitoring station will be installed to measure ambient concentratio...


Tlicho All Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4710. The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4671. The main objectives of the field work for 2020 will be: 1) to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and 2) to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collect...


City of Yellowknife Gold Project
Principal Investigator: Campbell, Joseph W
Licensed Year(s): 2018 2017 2016 2015 2014
Summary: Follow-up on exploration activity associated with MVLWB land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activities are successful. Work will ...


Environmental Baseline Surveys of the Fortune Minerals Ltd. NICO Project
Principal Investigator: Harris, Katherine M.
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this research project is to collect environmental baseline information for future environmental effects monitoring. Surveys may include assessments of water (surface and groundwater), sediment, benthic invertebrates, plankton, fish, fish habitat, wetlands, geochemistry, and geotechnical. Equipment for surveys will be limited to standard field measuring and surveying equipment, ...


Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


2010 Baseline Environmental Studies, Nechalacho Rare Earth Element Project Site
Principal Investigator: Moore, Steve M
Licensed Year(s): 2010
Summary: The 2010 baseline environmental studies will include the following: 1) A rare plant survey to be conducted in mid July (approximate) to identify presence of rare plants within the local study area. 2) An ecosystem mapping field component to be carried out in June and mid July (approximate) to describe existing habitat types within the local study area. Rare plant surveys will be conducted in ...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project-Fisheries Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2010 2009 2008
Summary: The fisheries portion of this baseline program has three primary objectives: to identify the fish species composition in a subset of the lakes and streams near the Thor Lake project area, to identify existing fish habitat in those lakes and streams, and to measure the current levels of mercury, rare earth elements and other trace elements in fish tissues. A secondary objective of the program is to...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


TOTAL PAGES: 3