14 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Yellowknife Lithium Project Environmental Consulting Services
Principal Investigator: Brezenski, Jeff
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5636. The purpose of the baseline program field studies is to: characterize existing conditions in the project vicinity and surrounding region to support project planning, permitting, and development of a proposed lithium mine. One continuous air quality monitoring station will be installed to measure ambient concentratio...


Environmental Baseline Surveys of the Fortune Minerals Ltd. NICO Project
Principal Investigator: Harris, Katherine M.
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this research project is to collect environmental baseline information for future environmental effects monitoring. Surveys may include assessments of water (surface and groundwater), sediment, benthic invertebrates, plankton, fish, fish habitat, wetlands, geochemistry, and geotechnical. Equipment for surveys will be limited to standard field measuring and surveying equipment, ...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project-Fisheries Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2010 2009 2008
Summary: The fisheries portion of this baseline program has three primary objectives: to identify the fish species composition in a subset of the lakes and streams near the Thor Lake project area, to identify existing fish habitat in those lakes and streams, and to measure the current levels of mercury, rare earth elements and other trace elements in fish tissues. A secondary objective of the program is to...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Vegetation Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The objectives of this study are to: - Develop vegetation classification maps for local and regional study areas around the Thor Lake project. This new mapping can be used to identify or assist in the location of sensitive or ecologically important ecosystems, culturally important plants, rare plants and rare ecosystems, and will be the basis for wildlife habitat availability mapping. - Conduct...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Soils, Terrain and Permafrost Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009 2008
Summary: Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project – Groundwater Hydrology and Hydrogeology
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...


Biophysical Baseline Studies in Support of the Izok Project
Principal Investigator: Fratton, Glenda
Licensed Year(s): 2012 2008
Summary: This research licence was issued for application # 785. The objectives of the research studies are the following: refine understanding of baseline conditions; provide input to design mitigation; evaluate potential changes in the environment in relation to the Izok Project; and contribute to the ongoing data collection of the Arctic environment. Gartner Lee Limited will collect and review exi...


Damoti Gold
Principal Investigator: Martin, Genevieve
Licensed Year(s): 2007 2006
Summary: This will be the second year of baseline environmental data collection, collected by Gartner Lee Ltd. on behalf of Anaconda Gold Corp. for the Damoti Gold Project. These studies will build on existing environmental data that was collected previously by various sources. The following tasks are associated with this study: fish and fish habitat assessments, hydrologic assessments and water quality as...


TOTAL PAGES: 2