12 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Ekati Diamond Mine
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5107. The main objectives of the field work for 2022 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality, and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4886. The main objectives of the field work for 2021 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Making a place for Indigenous fishing livelihoods: Navigating cross-scale institutions in Great Slave Lake fishery management
Principal Investigator: Wray, Kristine E J
Licensed Year(s): 2021 2019
Summary: This licence has been issued for the scientific research application No.4406. The research team seeks to document an oral history of the growth of the commercial fishery from the community perspective in terms of four stages: the Dene fishery (up to 1944), the early commercial fishery (1945-1969), federal management by the Freshwater Fish Marketing Corporation (1970-2018), and the present phase...


2008 Field Monitoring – Matthews Lake and Area Fish Habitat Restoration and Enhancement Project
Principal Investigator: Scott, Janet L
Licensed Year(s): 2008
Summary: This licence was issued for the application no. 802. The objective of the 2008 fieldwork is to monitor vegetation, invertebrates, and fish populations associated with lakeshore and stream habitat restoration and enhancement. Data will be used to evaluate the continuing success and effectiveness of restored or enhanced stream and lakeshore habitats against control sites, through time. Field ...


2007 Field Monitoring - Matthews Lake and Area Fish Habitat Restoration and Enhancement Project
Principal Investigator: Van Humbeck, Joe
Licensed Year(s): 2007
Summary: The objective of the 2007 portion of the project is to monitor control sites and treatment sites, and collect information on the habitat utilization. Data collected will be used to evaluate the continued success and effectiveness of the habitat construction and enhancement. Field crews will fly to Matthews Lake, landing either on the runway or the lake. The Treeline Lodge, where the research te...


Ecological Conditions in the Proposed Discharge Route of the Colomac Mine, NT
Principal Investigator: McGurk, Michael
Licensed Year(s): 2005 2004
Summary: The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Lookout Pond Fish Study - 2003
Principal Investigator: Mercredi, Jayda
Licensed Year(s): 2003
Summary: The objective of this project is to determine whether Lookout Pond, at the Ekati Diamond Mine site, is a fish bearing water body. Should any fish be caught, they will be released back into Lookout Pond and the project will be terminated. Fish capture me...


Pelzer Pond Fish Study - 2003
Principal Investigator: Butler, Helen
Licensed Year(s): 2003
Summary: The objective of this project is to determine if Pelzer Pond, at the Ekati Diamond Mine site, is a fish bearing water body. Previous fishing efforts conducted as part of a baseline study in 1999 indicated that there were no fish in the pond. The resear...


TOTAL PAGES: 2